Slate Rock Culvert Project: Alternatives Presentation Public Meeting 07.21.26
- Project Background
- Proposed Solutions
- Public Feedback
- Next Steps
PUBLIC MEETING 7.21.26 6:30 p.m.
To hear information on proposed solutions to replace Culvert #5 on Slate Rock Road. This project is funded in part by the Vermont Agency of Transportation.
Dubois & King Inc has developed preliminary plans for options to replace the existing culvert with a new structure that meets state standards and improves resiliency during flood water events, reducing future wash outs of Slate Rock Road. This presentation is to inform the public on the preliminary designs for a replacement, contingent on approval by the Guilford Selectboard.
This project is expected to go to construction in 2027. Draft presentation available at www.guilfordvt.gov.
Join Zoom Meeting:
https://us02web.zoom.us/j/85636782065
Meeting ID: 856 3678 2065
One tap mobile
+13052241968,,85636782065# US
+13092053325,,85636782065# US
—
Join by SIP
• 85636782065@zoomcrc.com
